全国最大的快3平台-全国快3信誉最好的老平台

全国最大的快3平台-全国快3信誉最好的老平台

Oilfield Water Management - Well Stimulation | 全国快3信誉最好的老平台-全国最大的快3平台

Water Management

Minimize water-related costs and extend your wells’ producing lifetime

Texture Subsea Blue

Control or shut off unwanted ‭water or gas production with an engineering approach‬

When the costs of lifting, handling, hauling, and disposing of water detrimentally affect well and field economics, choose an engineered approach to solve the problem. Whether your well needs a simple cement squeeze to shut off some unruly perforations or a conformance frac to unlock untapped reserves, Schlumberger has the technology and engineering expertise to help you manage your costs.

Improve sweep efficiency and recovery

In addition to managing water from producing wells, you can use many of the same water control—and gas control—technologies in enhanced oil recovery (EOR) operations that rely on water and gas flood operations. Shut off breakthrough zones to improve your sweep efficiency or prepare the well for new perforations.

Schlumberger worker in the field looking at equipment.

Our portfolio

Selected Options