Case Study North Sea Operator Cuts NPT with Foam Cement Blend
North Sea operator had successful placements of 7 conductors with foamed cement blend which reduced rig time
Ensure zonal isolation and casing integrity
In deep water, cementing operations are performed in technically and logistically challenging environments because of the risks associated with the conductor and surface casing cementing. Understanding these technical challenges is key to designing cement slurries that can meet deepwater specifications and provide required zonal isolation.