全国最大的快3平台-全国快3信誉最好的老平台

全国最大的快3平台-全国快3信誉最好的老平台

Talisman Energy Performs Multistage Stimulation in Just One 18-h Operation | 全国快3信誉最好的老平台-全国最大的快3平台

Talisman Energy Performs Multistage Stimulation in Just One 18-h Operation

Published: 09/24/2013

Blue hero texture

Unconventional completion method for high-risk shale well sought

In one horizontal well, Talisman Energy encountered challenging cementing conditions that resulted in less-than-optimal cement quality in the 700-m long heel portion. This meant that Talisman Energy could not perform its usual plug-and-perf completion method, which requires mechanical zonal isolation between stages for optimum stimulation. Talisman Energy needed a way to stimulate the interval cost effectively while minimizing operational time.

Continuous completion operation based on real-time reservoir response

To effectively stimulate the intended interval without bridge plugs, Schlumberger recommended a multistage stimulation approach using StimMORE fiber-laden diversion fluid and StimMAP fracture mapping service. StimMAP service would deliver microseismic event data within seconds, enabling real-time optimization of diverter placement and hydraulic fracturing treatments.

Slugs of StimMORE diversion fluid were placed into the fracturing fluid, eliminating the need for mechanical isolation between fracturing stages. The engineered fluid bridged stimulated intervals along the borehole, generating sufficient pressure differential to initiate fractures in unstimulated intervals. The process was repeated until the entire 700-m lateral interval was effectively stimulated.

StimMORE fiber-laden diversion fluid bridged previously stimulated intervals along the borehole, enabling uni-form, complete stimulation coverage of 700-m section in one continuous operation. StimMAP hydraulic fracture mapping confirmed stimulation in the heel portion of the well.
StimMORE fiber-laden diversion fluid bridged previously stimulated intervals along the borehole, enabling uni-form, complete stimulation coverage of 700-m section in one continuous operation. StimMAP hydraulic fracture mapping confirmed stimulation in the heel portion of the well.
Graph - Event distribution after stage one, prior to diversion.
Event distribution after stage one, prior to diversion.

Reduced risk, time, and costs compared with plug-and-perf methods

Integration of real-time microseismic data in the Petrel E&P software platform let engineers control placement of diversion fluid during the job. Talisman Energy and Schlumberger worked together to analyze< microseismic and pumping data after each diversion, confirm sufficient reservoir stimulation, and adjust the treatment as needed.

The design was completed as planned—in just 18 h and one continuous operation—saving 10 h versus conventional completion treatments. Microseismic data confirmed uniform stimulation coverage of the heel portion of the wellbore.

Graph - Evolution of stimulation by diversion stage.
Evolution of stimulation by diversion stage.
Location
Canada, North America, Onshore
Details

Challenge: Effectively stimulate 700-m lateral interval without using plug-and-perf completion method.

Solution: Complete multiple stages together by using StimMAP hydraulic fracture mapping service to guide placement of StimMORE fiber-laden diversion fluid.

Results:

  • Achieved even stimulation coverage in one operation through near-wellbore diversion of fracturing fluid into eight preperforated clusters in the well heel
  • Saved 10 h compared with conventional plug-and-perf method
Products Used