全国最大的快3平台-全国快3信誉最好的老平台

全国最大的快3平台-全国快3信誉最好的老平台

Asphaltene Deposition Measurement and Modeling for Flow Assurance of Subsea Tubings and Pipelines | 全国快3信誉最好的老平台-全国最大的快3平台

Asphaltene Deposition Measurement and Modeling for Flow Assurance of Subsea Tubings and Pipelines

Published: 10/04/2011

Premium
Schlumberger Oilfield Services

High-pressure deposition cell is used to measure asphaltene deposition from asphaltenic crudes under realistic field conditions of pressure, temperature, composition, and shear. The laboratory-scale data is then used to fine-tune and validate a recently developed asphaltene deposition model for the high-pressure deposition cell. Sensitivity analyses are performed to indicate the impacts of changes in model parameters on the deposit predictions. Through this exercise, the number of model parameters is reduced from six to two. The model predictions are verified with the deposition experimental data that were not used for tuning. The identified parameters then become inputs to the asphaltene pipe deposition model for predictions of deposit thickness along the tubings and pipelines in the field.

THIS ITEM IS PREMIUM CONTENT. TO ACCESS THE FULL CONTENT, SIGN IN OR REGISTER BELOW.
Sign in or register